Author profile
Mohran Shurrab
Project controls, forensic schedule analysis and claims

P.Eng, PMP
About
Mohran Shurrab is a project controls consultant at Elite Analytics Inc., the Toronto-based project controls, planning and claims consultancy. A Professional Engineer and Project Management Professional with more than twenty years in construction delivery, he works at the point where schedule, cost and contract meet — where a delay stops being a planning problem and becomes a commercial one.
His work spans forensic schedule and delay analysis, progress and delay reporting on live projects, schedule baseline development and review, and claims support for owners, contractors and counsel. Projects have included transit, mining, water and wastewater, and other infrastructure programs across Ontario and Canada.
He writes here on the questions that decide outcomes in practice rather than in theory: which delay analysis method the records can actually carry, what a contract says about cost that the parties assumed it did not, and how a project's own reporting either supports a position or quietly undermines it.
Areas of focus
- Forensic schedule and delay analysis
- Progress and delay reporting on live projects
- Schedule baseline development and review
- Claims preparation and expert support
Published articles
September 11, 2026
Project Controls
Tariffs and Canadian Construction: Where the Cost Actually Lands
The September 2026 counter-tariffs put duties of up to 50 per cent on the materials that form the spine of most budgets. Which side of the border a duty is collected on decides whose cost it becomes.
September 11, 2026
Claims & Disputes
When a Tariff Becomes a Claim: Entitlement, Complexity and Mitigation
Most commentary points at the wrong clause. Under CCDC 2 the tariff provision is GC 10.1, it adjusts the price automatically, and it runs in both directions — but claims are won and lost on quantum and notice.
September 11, 2026
Construction Law
Escalation Clauses That Survive Contact With a Claim
A price adjustment provision is only as good as the evidence needed to operate it. The drafting choices that look neutral at tender are the ones that decide whether the clause ever pays out.
September 11, 2026
Construction Law
Buy Ontario: Domestic Content Is Now a Claims Surface
Since April 2026 bidders on Ontario public infrastructure attest to where their materials come from. Tariffs push sourcing one way and the directives push it the other, and the gap between them is contractual.
Contact
Have a project, a schedule or a claim to talk through?
Tell us what stage you are at. We will tell you plainly what the records support and what we would do next.