Our software
Project controls, from baseline to boardroom
TideLine is the project controls platform we built out of our own claims and advisory practice. Build the schedule, measure it, prove the delay, present it — in one place, on live project data.
Why we built it
Every forensic assignment we take on starts the same way: reconstructing what a project's records should have told the team months earlier. TideLine exists so that work happens continuously, while the project is still running.
It combines a full CPM scheduling engine with schedule quality scoring, earned value, forensic delay analysis, Monte Carlo risk simulation and board-ready reporting — built by practitioners who have to defend their numbers under cross-examination.
- Entitlement is preserved contemporaneously instead of reconstructed years later
- One data set behind the schedule, the metrics and the expert exhibits
- Analysis methods aligned with the standards recognised in dispute forums
- Reporting your board and lenders can read without a translator
Modules
Eight modules, one project record
Schedule
Full CPM programmes — activities, WBS, logic, calendars, constraints, baselines — presented as executive timelines and roadmaps without rebuilding a slide.
Design
Deliverable tracking with rules of credit, activity links and full design-stage earned value.
Quality
DCMA 14-point plus four more standards, with your own weights and thresholds.
Metrics
Earned value, activity statistics and delay statistics — status reporting from live data.
Delay
Windows analysis across two P6 (or PDF) schedules with full traceability to cause and responsibility.
Risk
Monte Carlo schedule and cost risk with tornado charts and contingency sizing.
Extractor
AI-assisted extraction from emails, RFIs, minutes and PDF schedules into dated, evidenced events.
Reports
Board-ready PDF, DOCX and PPTX evidence packs.
How it works
Build it — or import it
Start from a blank timeline, a plain-language description, or existing Primavera P6 XER and MS Project files.
Measure it
Score schedule quality against industry standards, track earned value, and simulate schedule and cost risk on the live programme.
Prove it
Windows analysis compares schedules period by period, traces driving paths and ties every day of delay to a cause.
Present it
Executive Gantt boards, status reports and comparison exhibits exported to PowerPoint, PNG and PDF.
Standards supported
DCMA 14-Point
Schedule health assessment
GAO
Schedule Assessment Guide
AACE RP-90R-19
Recommended practice
NDIA PASEG
Planning & scheduling
USACE / NAVFAC
Federal schedule specifications
SCL Protocol
Delay & disruption methods
Contact
Have a project, a schedule or a claim to talk through?
Tell us what stage you are at. We will tell you plainly what the records support and what we would do next.